Tunnel Tiergarten
Description:
The Tiergartentunnel (official name: Tunnel Tiergarten Spreebogen) is a traffic tunnel in the city of Berlin. The tunnel runs South of Central Station, under the river Spree and city park Tiergarten.The tunnel was opened for traffic on March 26th, 2006 |
|
Tunnel length:
2392 m |
|
Ventilation method:
Longitudinal ventilation with single point extraction |
|
Scope of supply:
7 exhaust fans, suitable for operation at 100°C during 60 minutes 1 fresh air fan 74 jet fans with a thrust of 450N Silencers, dampers, transition ducts and separation walls. |
|
Delivery:
Factory acceptance testing, shipping, installation, commissioning and site acceptance testing. |
|
Completion date:
August 2005 |