Mositunnel
The 1142 m. long Mositunnel under passes Ingelbohler forest. The tunnel is constructed for bi-directional traffic in one tube with 2 lanes and serves as connection between motorway A4 and Main road 2. The tunnel opened in 1965. To comply with current safety standards the tunnel will be modernized. A new escape corridor will be constructed with 3 connections to the main tunnel. The ventilation system will be modified to a longitudinal ventilation system.
Zitron Nederland performs following tasks for this project:
Supply, installation, commissioning and testing of:
|